FlossyDFlynt said:
hokiewolf said:
I'm hopeful that LA will feel some heat and fix their system like they said they would.
I dont think they will. If the mass exodus of people/businesses wont do it, anything Trump does certainly wont get it done.
Its also the reason I think Gavin is unelectable at the federal level.
What in the name of all that is holy are they even doing with these building permit reviews out there that's taking so ridiculously long?
Look at setbacks, lot coverage, impervious, building height, side wall heights, stormwater, utility connections, life safety egress stuff for the building, and roll on. This should take 2 rounds of review, 3 tops, and take 4-8 weeks, not years.
Getting rezonings and subdivisions done takes forever but building permit reviews should be fairly mundane and perfunctory. It's a house, not a 47-story skyscraper.
Delegate the authority for structural, fire, and seismic to the respective design engineers of record so you don't have City staff reviewing and owning gnat's ass technical details on the structure, stamp the thing, and let these people build their houses and lives back.